This article is outdated. Deep based colors were an increase in price back in the 90's. Most stores have a standard price for all colors now. The problems the author are citing are outdated and rarely happen. This is the 2nd time I've seen this article being emailed out, it's irresponsible of angies list to keep sending out this poorly written and inaccurate article.

I had originally budgeted a lower amount for this project....painting had always been a DIY project in this home, so I didn't have a clue.    Now that I'm older and less nimble, I decided to hire it out.    Waldner's Handyman Services was very professional and worked with me to understand how costs were factored into my painting project.  I am very satisfied with the finished result and will use them again for future jobs. 


When coverage is difficult to estimate, add more rather than less when doing DIY wall painting. You can always pour the leftover back into cans. For large jobs, use the bucket and a roller screen rather than a roller tray. It’s much faster to load your roller with the screen than to use a roller pan. Simply dunk the roller into the paint bucket, then roll it along the screen until it stops dripping.
When their bids are successful, contractors meet customers to finalize their requirements and plan the order and timing of work. Contractors estimate the time required for surface preparation, painting several coats and drying time between coats. For interior painting jobs, they might have to allow time for clearing rooms. Exterior painting schedules might be dependent on the weather in different parts of the country. Exterior painting is not practical in very wet or very cold conditions.
When painting the trim, you don’t have to be neat. Just concentrate on getting a smooth finish on the wood. Don’t worry if the trim paint gets onto the walls. You’ll cover it later when painting the walls. Once the trim is completely painted and dry (at least 24 hours), tape it off (using an “easy release” painter’s tape), then paint the ceiling, then the walls.
After any areas repaired in the previous step are primed, we apply premium quality paints for a uniform finish. There are multiple finish options, including flat, matte, eggshell, satin, semi-gloss, and high-gloss, and we will have gone over the benefits of each with you beforehand so you can make an informed decision. The time will vary depending on the size of the job, but we will always ensure to work as quickly and efficiently as possible.
The Painter Guide was created by Eric Barstow of PaintingBusinessPro.com and Chandler Zieg of PaintingLeads.com. We come from a vast background in house painting. Our national painting company produces over $4 million in revenue each year and our education and advertising service for painters sells over $1.5 million per year. We’ve literally helped thousands of painters grow their businesses.
The Lead Renovation, Repair and Painting (RRP) Rule establishes requirements for firms and individuals performing renovations, and affects contractors, property managers, and others who disturb painted surfaces.  It applies to work in houses, apartments, and child-occupied facilities (such as schools and day-care centers) built before 1978.  It includes pre-renovation education requirements as well as training, firm certification, and work practice requirements. 
Your home is your most important asset and maintaining it is vital in upholding and increasing its value. As a full-service painting company, Home Works Painting will provide you with a superior professional painting experience. Our services include interior/exterior painting, drywall repair/installation, wood replacement, pressure washing, and color consulting. We stand behind our work by offering a six year warranty.
When you’re ready to tackle your next paint project, we offer an amazing choice of colors from top paint brands, at the best price, and expert know-how to help you do the job right. Start outside by taking an inventory of your siding and trim. If your paint is fading or peeling off your siding, start the prep work by repairing the siding and trim with some waterproof patching compound. Once dry, sand and apply primer. Then, repaint those areas until your exterior looks fresh and clean.
Payment. Every client is different. Every job has it's own unique set of circumstances. I always start off the discussion with my clients saying that I'm flexible on how they would like to proceed with payments but that I prefer half down. I refuse to change order. Change orders are my last resort. Instead I ask questions at our initial meeting and try to be sure to cover all bases before I submit my estimate.

Not only careful communication is essential, but we would greatly recommend, when you pick out your type and brand of paint that you go and pay for it, with the contractor's discount, which is given by Sherwin-Williams and most paint companies. Then you will know how much paint you purchased and the coverage. If it is possible, inspect the work of the painter daily.
We charge $55 per hour for labor and i constantly hear that is too much. If house cleaners are between 50 and 90 per hour and my lawn cutter gets 70 for an hour I’m always confused that a professional painter with all insurances almost always has to negotiate his or hers hourly wage. It just seems that the painting profession gets very little respect compared to other trades
We charge $55 per hour for labor and i constantly hear that is too much. If house cleaners are between 50 and 90 per hour and my lawn cutter gets 70 for an hour I’m always confused that a professional painter with all insurances almost always has to negotiate his or hers hourly wage. It just seems that the painting profession gets very little respect compared to other trades
Transitioning your painting business away from these mistakes can be difficult, but I guarantee you it’s worth it. You’ll look back at your business and say, ‘How did I even operate that way?’ Once you start doing things more efficiently and reaping the benefits, you’ll be UNABLE to return to your old ways of running things. Try eliminating just 2 of these mistakes and see what happens!
First off, the picture on the top THAT IS A HOME OWNERS PAINT JOB. If you here a school kid or your neighbor, this is what you get. I was a painting contractor for the better part of 40 years and never saw a PAINTER (even the worst painter) leave a mess like that. Maybe the electrician or the carpenter but, that is not something a painter could even do if they tried.
I disagree with your criteria to hire a painter. A prompt returned call is nice but does not indicate the quality or fairness of the painter. As far as a written estimate, that should be more of a qualifier for the bid versus an evaluation criterion. I'm not sure one would have favorable results by hiring a painter on this basis. As far as the bidding process, change orders should ONLY be used if the customer requests additional scope (PMP 101). Angie's list should consider asking reviewers if/how much they were told to pay compared with the estimate. Unfortunately, there are a lot of contractors that are unethical and need to be accountable.
Consider purchasing supplies personally to save money. Ask the painter for a bid that separates labor and materials. Then explain that you'll purchase the materials and ask for a list of exactly what will be needed to complete the job. Caulking, for example, is an extra supply commonly used to fill any cracks or damaged areas in your walls -- and one that might be overlooked in an incomplete list.
Inspect the surface area for holes, cracks or other problems and apply acrylic caulk to fill them in. Use a putty knife to smooth out the caulk and remove any excess to prevent bumps. For particularly thin or narrow crevices, you may have to use your finger to smooth out the caulk. Caulk contracts and shrinks, so apply a second layer once it's dried.
Second: all the tricks of the trade in regard to "cheating" customers is for hustlers and cheaters and NOT established businesses. At the end of the project the job should come out looking professionally painted as specified in the contract. A selected color that takes multiple coats that was not calculated by the contractor should cost more money. It's not the fault of the painter.
You are right on with this - why do people leave switch plates on when it's just so easy to take them off? Another thing that happened to us - we had the popcorn ceiling taken off and the ceiling painted white. When the job was done and I later went to change out all the fixtures/fans, they had left every fixture in place, so there was a large patch of popcorn and unpainted ceiling left behind - it just didn't dawn on me to specify that they take those down before scraping and painting. It was kind of a mess.
You can check the status of your application online, and when approved download your certificate and customized lead program logo. To access this service goto EPA's E-Enterprise portal, sign-in using your CDX username and password, choose “allow” access, then scroll to the bottom of the page where you’ll see your information in the “progress tracker” section.
Here is where this affects you as a consumer. You select a painter with a contract that says 2 coats, $500 down. You give the company the deposit and pick your colors a couple of days before the project starts. The painter goes to the store with your colors and figures out they are deep base. He (or she) not only needs to charge you more for the paint, but he also needs to charge you for a dark gray primer coat. Ninety nine percent of the time that primer coat is going to be really, really expensive since you already gave a deposit.

While we are happy to be recognized for our quality customer service we also realize that if we treat others the way we want to be treated then most if not all of our customers will be pleasantly surprised by using our company as their personal home painters throughout the Denver metro area. We are eager to meet many more of you this coming house painting season too.
As a former professional painter, something that drives me crazy is when I see painters cut in around wall plates. First of all, the amount of time that it takes to cut in is usually much longer than the amount of time that it takes to simply remove the wall plate. Secondly it does not look nearly as clean as it does when the wall plate is removed and thirdly it can invariably leave paint on the wall plate itself which also looks sloppy. Make sure the painter takes them off and then reinstalls them. It's less time.
This all comes down to the rules.....1. references....does the contractor have them??? I ALWAYS furnish all my prospective customers them....no excuses...2. insurance....again, I always furnish proof....3. Read the proposal carefully...I ALWAYS list materials down to tape used, the brand, the grit of sandpaper, the manufacturer, etc....its INEXCUSABLE to not list all of these items....I am a member of the PDCA, the Painting and Decorating Contractors of America, the foremost authority in the coatings industry and they also approve of what I listed....if you do not follow these guidelines, you will NOT get a job reflective of "professional". Look for the PDCA where any painting contractors are, if they are not a member, RUN!
Day-to-day tasks can consume too much time when there is little or no automation. Countless cloud-based productivity tools are available to streamline and automate your tasks. These tools can usually be put into place with little disruption to your current practices. Ultimately, integrating new automation tools will increase productivity and help you make the most […]
When you choose CertaPro Painters® for your exterior painting services, you can be confident that you’ll get the highest quality paint job from an experienced team of expert painters. At CertaPro Painters®, our goal is to deliver extraordinary experiences. We do the painting, so you can do life. When you’re ready to schedule your free painting estimate, contact us.
IF the average cost is $1700 to paint an interior, then that means the cost of paint is approx. $200 (12% of the job).  Or better said 5 gallons of paint (if the average cost is $40 retail).  The average room takes 1.5 gallons which will cover 3 average rooms.  Doesn't sound to average to anyone with knowledge of this industry or a average house.  You are misleading consumers and should do a better job in your research.  No wonder so pay people think prices to get work done by professionals is high.  Its not high, its actually average which is more like $3700.

The food was excellent and the service was good. My only complaint would be that they would not sea...t us until all of us were there (we had 6 in our group). They wanted us to sit at the bar, but there was no seating available at the bar. I can understand this as a general rule, especially if a restaurant is busy or crowded, but almost all of the tables were vacant when we arrived. The weather was nice, so we waited for our friends outside and it all worked out fine in the end. See More


A GREAT Paint Contractor NEVER Asks for a Deposit While some paint contractors may request a deposit before beginning the work, well-established, successful painting professionals have sufficient operating income and can easily afford to purchase materials and make payroll. BE WARY of a contractor who asks for a deposit! If he is unable to purchase materials, he's probably unable to pay his staff. Every year, too many homeowners fall victim to contractors who walk off the job - and out of town - with the deposit in their pockets. If you agree to advance payment of any kind, be sure materials have been purchased and are on your property, leaving you leverage should the contractor default on the work. Bottom Line: GREAT painting contractors NEVER request a deposit.
×