As a painting contractor I find that most contractors charge between $20 an hour and $45 an hour plus paint and materials pending overhead here in Pennsylvania i figure $30 an hour is a safe bet. figure a good painter should be able to prep a 12 x 12 to a 12 x 15 room, caulk, apply 1 or 2 coats to the ceiling 2 coats on the walls and 1 coat on all baseboards, trim, doors and crown moulding in an 8 to 9 hour day. This is with minimal or minor spackling repairs like nail holes and nail pops, not cracks and peeling tape. Thats extra paint is usually  $30 to $70 a gallon pending quality. A room this size will need 1 gallon for the ceiling 2 for the walls and maybe 1 gallon for the trim, doors ext... the square foot price is $1.50 - $3.00 as far as asking for money up front I never ask. If the home owner buys the paint there is no need for money and if your buying the paint and your an established contractor you have an account with your supplier's.  any ways that's my input and guidelines 
Consider purchasing supplies personally to save money. Ask the painter for a bid that separates labor and materials. Then explain that you'll purchase the materials and ask for a list of exactly what will be needed to complete the job. Caulking, for example, is an extra supply commonly used to fill any cracks or damaged areas in your walls -- and one that might be overlooked in an incomplete list.
I would not recommend this company for the following reasons:1. Original appointment was very specific to them on what was needed and to take photos for 3 apartment unit plumbing fixture repairs. One unit had a bathroom tub/shower backup.2. No photos taken, 3 trips later and only 1 unit completed to satisfaction. (Backup) 3. Other faucets unable to find on line with their suppliers and repair 4. Had to find another plumbing company to complete the jobs. 5. Invoicing had to be redone as not in detail of job address for tax purposes 6. Bad communication throughout the project process with their internal customer service. Their technician and project manager ordering parts. 7. For the back up. Did not bring out correct snake on both trips and had to replace lines as too small to break through backup. Costing over $800 for 3 trips just to complete that situation out. 8. Ordered the wrong parts when 2nd trip out since no photos taken to confirm what was needed. Very dissatisfied and will never ask them to work in any of our rental properties again. 

I would not recommend this company for the following reasons:1. Original appointment was very specific to them on what was needed and to take photos for 3 apartment unit plumbing fixture repairs. One unit had a bathroom tub/shower backup.2. No photos taken, 3 trips later and only 1 unit completed to satisfaction. (Backup) 3. Other faucets unable to find on line with their suppliers and repair 4. Had to find another plumbing company to complete the jobs. 5. Invoicing had to be redone as not in detail of job address for tax purposes 6. Bad communication throughout the project process with their internal customer service. Their technician and project manager ordering parts. 7. For the back up. Did not bring out correct snake on both trips and had to replace lines as too small to break through backup. Costing over $800 for 3 trips just to complete that situation out. 8. Ordered the wrong parts when 2nd trip out since no photos taken to confirm what was needed. Very dissatisfied and will never ask them to work in any of our rental properties again.
Ask companies to include all details in writing. Although that sounds simple enough, too many contractors submit offers such as "paint house for $5,000." A friendly contractor may offer a reassuring handshake and promise that the crew will take care of all the details — starting on time, working every day, cleaning up, etc. That's great, but why not include each point in the proposal? If it's a challenge to get a written description of labor, materials and other details, things will probably get worse when the work starts.

“Joining PDCA and working towards our accreditation has been hands down one of the best things we've done to help grow our business and ensure we're doing things right. It has been invaluable to be part of a group who is striving for excellence just like we are, and as a new painting business being able to connect and learn from others has been incredible. “


I disagree with your criteria to hire a painter. A prompt returned call is nice but does not indicate the quality or fairness of the painter. As far as a written estimate, that should be more of a qualifier for the bid versus an evaluation criterion. I'm not sure one would have favorable results by hiring a painter on this basis. As far as the bidding process, change orders should ONLY be used if the customer requests additional scope (PMP 101). Angie's list should consider asking reviewers if/how much they were told to pay compared with the estimate. Unfortunately, there are a lot of contractors that are unethical and need to be accountable.
I disagree with your criteria to hire a painter. A prompt returned call is nice but does not indicate the quality or fairness of the painter. As far as a written estimate, that should be more of a qualifier for the bid versus an evaluation criterion. I'm not sure one would have favorable results by hiring a painter on this basis. As far as the bidding process, change orders should ONLY be used if the customer requests additional scope (PMP 101). Angie's list should consider asking reviewers if/how much they were told to pay compared with the estimate. Unfortunately, there are a lot of contractors that are unethical and need to be accountable.

Once work begins, hold brief daily meetings to discuss the job and schedule and quash any misunderstandings. If there are surprises, seek middle ground. No contract can anticipate every possibility. Materials may be unavailable. Large chunks of rotten siding may crumble along with the old paint. Exterior jobs may be stopped cold by a week of steady rain. But know that you'll pay extra if you change your mind about a color after the trim is already painted or otherwise add tasks to the project.

The cost to paint an average size room (10X12) ranges from $380-$790, not including ceilings, trim or cost of the paint. DIY, this can cost between $200-$300. When estimating the cost, painters will start with how much paint will be required to complete the job. To know this, they first need to know the size of the area to be covered. The easiest way to calculate the size of the paintable area is to add together the length of the wall and multiply it by the width of the room from floor to ceiling. The resulting amount is the room's square footage. This total is a starting point, as it is not all paintable surface. The painters won't paint the windows and doors, for example, and they must account for ceiling trim and baseboards as well. The next step is to subtract the area of the doors and windows -- along with the square footage of the trim and baseboards -- to get an average. Then, use the same calculation (length x width) on the windows, doors, trim and baseboards, and subtract all of those numbers. The result of this equation is the square footage of the room's walls. This is your surface area number. (Painters will typically add a little square footage back in to this amount to account for extra paint, which may be required.)
According to the Bureau of Labor Statistics, 45 percent of all painters are self-employed, though that number may be slightly higher if companies hire freelancers or self-employed painters as part of their team. The price that painters charge for their services is largely dependent on their association and whether the job is completed in the warmer or colder months (painters often charge more in the summer and less in the winter, given demand and other factors). More information regarding painter rates and associated factors is included below.

Oh, where to begin? Let me start with 'watered down paint'. 25-50% before the material gets to the site? Impossible. You would basically be painting with water at that point. It would be less of a hassle, and cost, to simply use proper material. You would be forced to apply three coats instead of two, as the coverage would be horrible. Whatever cost you think might be saved in materials would be lost in labor.
Oh, where to begin? Let me start with 'watered down paint'. 25-50% before the material gets to the site? Impossible. You would basically be painting with water at that point. It would be less of a hassle, and cost, to simply use proper material. You would be forced to apply three coats instead of two, as the coverage would be horrible. Whatever cost you think might be saved in materials would be lost in labor.
Our family owned and operated painting company is your one stop shop for interior painting, exterior painting, and home repairs. We are a quality first painting company. Our expert team of painters provides quality work and experience that can be measured. Allow our expert team of painters to show you a level of home painting that you can be proud of.
Did you even read the article? It was specifying UNSCRUPULOUS painters! And, by the way, the photo at the top was not identified at all. How would anyone know whether it was done by a homeowner or not? Also did you ever stop to think that if a consumer has the knowlege to spot a dishonest contractor then by default he also has the knowlege to identify an honest one as well? And, pardon me, but just because you've never seen something has absolutely nothing to do with whether it has actually happened to someone else. Why would any honest business person be so defensive about the publishing of such useful information? If any painters/painting contractors object to a consumer having this kind of information maybe they are the dishonest ones!
This all comes down to the rules.....1. references....does the contractor have them??? I ALWAYS furnish all my prospective customers them....no excuses...2. insurance....again, I always furnish proof....3. Read the proposal carefully...I ALWAYS list materials down to tape used, the brand, the grit of sandpaper, the manufacturer, etc....its INEXCUSABLE to not list all of these items....I am a member of the PDCA, the Painting and Decorating Contractors of America, the foremost authority in the coatings industry and they also approve of what I listed....if you do not follow these guidelines, you will NOT get a job reflective of "professional". Look for the PDCA where any painting contractors are, if they are not a member, RUN!

I have a Home Improvement/Painting business, and Angie's List always advertises that that everyone is out to get them. Of course there are people who try to take advantage of homeowners My reputation and repeat business is based on word of mouth. Shoddy work is always a way to get put out of business quick. As far as strictly painting, preparation is a big factor in getting a quality paint job. If you don't prepare the surfaces you are painting you are spinning your wheels, and wasting money, no matter what paint you use. Getting a deposit from a customer is beneficial, but not always necessary. Sometimes it is a godsend, when you get stuck by the customer, which has happened to me more than once
When you’re ready to tackle your next paint project, we offer an amazing choice of colors from top paint brands, at the best price, and expert know-how to help you do the job right. Whether you’re making a colorful update to the interior or exterior of your home or working on a unique DIY project, you can really pour on the creativity with our unmatched selection of paints and exterior stains, craft supplies like chalkboard paint, stencils, glitter, or even glow in the dark spray paint. You should also check out our paint project and buying guides as well as The Home Depot Blog for current paint trends, popular color palettes and paint craft ideas. For all your painting needs, small and large, we’ve got you covered at The Home Depot.

It is one of our core values to ensure our clients’ dreams for their home comes true. So often, clients come to us for a new coat of paint or a repair but what they really want is so much more. We understand your house is your home and that when it is time for change or for a repair, you want a crew that will take care to make your home look its best.
Back to the article. You can add water to all latex based paints / thinner to oil based paint. The tinting base has absolutely nothing to do with it. Say you are working outside and throughout the day you have to add a little water to keep the same consistency. If somebody really tried to add 20% to 50% water they no longer would be painting they'd be performing a whitewash or pickle finish.
Paint gets more expensive as you go from flat to gloss. The difference is usually around $1 per gallon per sheen upgrade. Flat is the cheapest, then matte flat or eggshell, satin, semigloss then gloss. Paint also gets much more expensive the darker it gets. A white or neutral paint color can be as much as $20 less expensive than a deep base red or blue.
This article is outdated. Deep based colors were an increase in price back in the 90's. Most stores have a standard price for all colors now. The problems the author are citing are outdated and rarely happen. This is the 2nd time I've seen this article being emailed out, it's irresponsible of angies list to keep sending out this poorly written and inaccurate article.
Contractors apply several layers of paint to achieve a suitable finish. They leave the first coat to dry for the recommended time and apply one or more finishing coats. They might choose paints with special qualities for different types of room. Manufacturers have developed paints for bathrooms or kitchens that have good resistance to moisture for example. When they have completed painting, they clear away any equipment and restore the area to its original condition.

If you talk with a painting contractor long enough, you’ll inevitably hear; “There’s no good help out there.” It’s easy to hide behind this excuse, but it’s not true. There are plenty of reliable painters out there, business owners just don’t take the time to find them. It takes TIME to find good people, time you wouldn’t have if you were busy painting.
As an owners rep and former estimator for a gc i do expect to pay a reasonable deposit say 10 percent and then weekly progress payments. I am asking the painter to book his time and to do the work on my schedule. Most painting companies are not huge operations they will pay their staff weekly. For most repaints i ask for one tinted primer coat and one finish coat for 100 percent coverage. New work gets one tinted primer and two finish coats for 100 percent coverage. The cost of the paint is not really that different for colors or finish. Brands like european fine paint and C2 are more expensive than Ben Moore and sometimes more difficult to roll based on their consistency. Some home depot brands are as expensive as the Ben Moore and of equal quality others aren't. Red paints are notorious for number of coats required and special priming requirements.
The color scheme that is chosen for the home creates the initial impression that an individual has of the premises as a whole.  Whether complimentary or unflattering colors are selected, the house will gain an identity of its own when the paint is applied.  There are many times that a homeowner misses opportunities to accentuate positive attributes that the home has to offer by failing to choose the best exterior paint colors. 
First off, the picture on the top THAT IS A HOME OWNERS PAINT JOB. If you here a school kid or your neighbor, this is what you get. I was a painting contractor for the better part of 40 years and never saw a PAINTER (even the worst painter) leave a mess like that. Maybe the electrician or the carpenter but, that is not something a painter could even do if they tried.
This company painted my house about one year ago. We have paint peeling off the exterior of the house now. We have left many messages for him to come out and fix the problem, he gave us a warranty incase this type of thing happened. We bought the best paint and primer the problem was in the prep work, that's why its peeling off of the house. Basically 3500 bucks down the tube be aware his warranty is worthless...
Yes the pricing does change, and quite significantly. I have worked inside the paint industry on counter sales outside sales and application for over 10 years. One thing many people do not understand is, the resins in the paint are more expensive to produce the higher the sheen goes. Therefore the company is at of higher cost making the paint, which in terms they charge more for the paint. I have seen a 15$ variance between flat-semi-gloss it is not uncommon and is not unrealistic to pay more for a higher sheen. Another thing to add is when doing samples on your wall prior to a painter coming is a good idea, however do not do them in huge squares with heavy coats, remember you are just wanting an idea. A lot of times the issue comes up of the paint not covering the sample coats, in fact it is covering quite well, however the paint sample applied is often times much darker than the wall color, creating a contrasting difference from the lighter surrounding wall and the sample placed on the wall. I recommend getting a piece of sheet rock and using it for the samples so you can move around with it etc.
This guy Joe told me he was an expert at refinishing wood doors so I hired him but he wanted to paint the whole house to make it worth it. He then sent two Hispanics. Only one of whom spoke English . They painted the house left a huge mess then painted my mahogany doors with primer. The next day they painted them brown thus ruining about 5000 dollars in doors .I was at work in the four hours it took them to ruin my doors. Never leave anyone alone without watching. That was my mistake. The owner Joe refused to fix them and was such a crazed person shaking and starting to cry so I paid him 4000 dollars to go away. A week later that ugly brown paint bubbled up. Again I texted him the pictures and asked him to fix them. He refused . I plan on taking them to small claims court. He is  not what he says he is. He actually didn't touch my house he has no idea how to refinish wood doors. Please come by and see my awful paint job at 615 SE 26th Ave. Ft. Lauderdale ,Fl  33301 Observe closely the brown paint over white primer showing through. So embarrassing.
When hiring a contractor it is always best to hire one who is personally referred to you by someone you trust. Hiring through ads or phone book is hit and miss. Check with your local paints stores, they know the good guys from the bottom feeders. Go to the stores that sell the high quality paints like Benjamin Moore(nonpareil), Pittsburg, Sherwin Williams or Glidden. Don't go the the big box stores for referrals, the people there don't know squat!
I am a painting contractor and have been since 2001. Make sure the estimate provides in writing: What is EXCLUDED as well as INCLUDED. It should state the manufacturer and type of paint going to be used. Estimate says ALL LABOR AND MATERIALS. My estimates to my customers say "guaranteed coverage" eliminates the conversations of 1 coat vs 2 coat. I have my customers submit colors 5 days prior to start date. Customers need to inform me if they are going to use pure white, dark reds, oranges, and bright yellows they need to inform me in that 5 day window, so I can adjust my pricing for 3 coats. Although this more uncommon now than years past because a lot of paint manufacturers have primer with paint products. Let the contractor know if your doing accent walls. This takes longer to cut in straight lines and it requires the contractor to purchase more paint. If you add anything on the scope of work have the painter write out the description and cost prior to them doing the work. Have the estimate say how many days it will take to perform the work. Ask how many workers will be doing the job. Make sure to enforce that number of workers their everyday until the job is complete. Do not give final payment until you do a final walk through. Walk the job when its almost complete and point out areas that you want fixed prior to the contractors final walk through. Its best to do while the workers are still in that particular area as they will have tarps down and areas covered and it will be easier for them to take care of. Purchase a roll of blue tape and stick it to areas that you want fixed. This is called a punch list.
One of the fastest, most effective ways to personalize your living space is with color. Bright, muted, cheerful, elegant—whatever your mood, personality, or preference might be, there’s a paint color to match! Our local Five Star Painting teams specialize in making houses feel like homes through interior and exterior home painting services. If you're looking to transform your home, it's time to contact Five Star Painting. Call (888) 261-3633 for a free estimate, or schedule an appointment online. Let us help you paint your world!
With that said, here's the reality of that particular scenario. Painters do put water in the paint, but not for reasons you would think. Some materials need to have their viscosity manipulated in order to slow drying time, allowing gravity to 'smooth' out the product for a better finish. It also prevents 'drags' and 'sausages'. I personally try not to do it too often, but from time to time I have to. I want my client to have a proper finish.

Prior to the release of Old Ramon, Kozelek released a solo seven-song EP entitled Rock 'n' Roll Singer in 2000. The record consisted of three original acoustic compositions with minor full-band arrangements and four covers (three from Bon Scott-era AC/DC, and John Denver's "Around and Around") that further revealed Kozelek's fascination with 1970s classic rock. Six months later, Kozelek released his first solo album, What's Next to the Moon, which was made up entirely of acoustic covers of even more Bon Scott-era AC/DC songs, including re-recorded versions of the tracks that had appeared on the previous EP. The record was uncharacteristic of Kozelek (though he was prone to covering songs by his favorite artists) in that it is one of the shortest full-length albums of his to date, clocking in at just over thirty minutes. Both the EP and album were released by Badman Recordings.


If you're going to do any part of the painting or prep work on your own, you must know that the first step in preparing a surface is washing it. Since dirt can affect the smoothness of a surface area -- and therefore paint's adhesion to it -- use soap to remove any dirt or stains. Make sure there's no soap left on the walls when you're finished; also make sure to remove any gloss with sandpaper and vacuum up the leftover dust.
My husband has been a professional painter over 30 years. He prides himself in his high level of work ethic and customer satisfaction. He stays up to date on techniques and finishes. He gives Very detail and accurate appraisals with contracts. At an alarming rate, as he starts to finish the last day or the day before, the client starts nit picking and being disrespectful towards his work when every day prior to that, they were very pleased, as he request ongoing satisfaction throughout the job. Then they don't to want pay remaining balance, bicker about final cost, or stop payment. He has a crew he has to pay whether the customer does or doesn't honor the contract as well as our own household expenses. Wasted time ,labor, money and effort lost. Now how do we fix this? Remind yourself and clients that a contract is based on honor.

I do not mean to come off with an edge, however, this is an article for people hiring low bid, uninsured, one man band painters out to "hustle" a buck. Hire reputable, established companies or hire someone you know or have a strong referral from. If you are arguing over watered down paint, ticky, tacky deposits, buying your own supplies, you have hired the wrong guy.

The food was excellent and the service was good. My only complaint would be that they would not sea...t us until all of us were there (we had 6 in our group). They wanted us to sit at the bar, but there was no seating available at the bar. I can understand this as a general rule, especially if a restaurant is busy or crowded, but almost all of the tables were vacant when we arrived. The weather was nice, so we waited for our friends outside and it all worked out fine in the end. See More

The Painter Guide was created by Eric Barstow of PaintingBusinessPro.com and Chandler Zieg of PaintingLeads.com. We come from a vast background in house painting. Our national painting company produces over $4 million in revenue each year and our education and advertising service for painters sells over $1.5 million per year. We’ve literally helped thousands of painters grow their businesses.

We've heard countless stories of people who have been let down by other house painting services. No one wants to take valuable time off of work to wait for painters who never show up. At Handy, we pride ourselves on connecting our customers with reliable and trustworthy residential house painters. They will arrive on time, fully ready to do your job.
IF the average cost is $1700 to paint an interior, then that means the cost of paint is approx. $200 (12% of the job).  Or better said 5 gallons of paint (if the average cost is $40 retail).  The average room takes 1.5 gallons which will cover 3 average rooms.  Doesn't sound to average to anyone with knowledge of this industry or a average house.  You are misleading consumers and should do a better job in your research.  No wonder so pay people think prices to get work done by professionals is high.  Its not high, its actually average which is more like $3700.